« walls & inch worms | Main | Mondy night what to do »

Back to work

Last week was homecoming for IUP so I took it easy and did some cleaning and help around the house before we went to the parade and football game.

So this weekend back to work. Dispite not having alot to show for my work to day I still feel like I got alot acomplished. And something always comes up .. like the boiler starting to drip water from somewhere. (I'm still looking into this one) Will post later on the findings.

Today I got the lower pannel of drywall on two wall sections today. This was fairly time consuming as both these walls were the window walls. The room is actully starting to look like a room now. This is scarry.

I also removed three storm window (if you can call them that) remains. Two were removed from the bathroom and one from the rear window of the MBR. I am planning on placing an order for 4 storm windows this Monday so I needed acurate measurements for these. Once I get the storms in place I will be free to rebuild the sashes on the windows them selves. I guess I could put plywood in but that is not that great a solution :-)