weekend wall
This past weekend was actually very successfull in the bathroom area. I was able to get the entire wall of sheetrock up on the wall that separates the bathroom from our MBR. This will enable me to work at night (like that will actually happen) on the bathroom. :-)
Dispite it taking me 2 days to get the sheetrock in place its there now. This wall did have alot of holes to account for in my cuts. I also had to get the shower cubby (niche) in place before I could get the wall closed up. The shower cubby (niche) is very nice if I dont say so myself. The wall will be insulated when ever I get into that space from the other side (roughly 1.5 years from now) but none the less its up and only one more outside wall to sheetrock.
Matthew stays very ocupied with the plugs from the tools I'm not using. He has an extention cord that is not plugged into anything that he uses the female end of then plugs and unpulgs the various tools. He seems to enjoy this and has his own things that he is doing. I usually have to ask to use the drill when needed. :-) But he will usually let me use it without too much fuss ..
.... Ahhhh remodeling with preschoolers