« AC update - 4529 | Main | AC update - 4555 »

Evening fun..

So I've been working in the evenings lately. The plumber will be arriving early next week to do the line set. That means I have to have everything finished (save my return air stuff which I will just put a few filters over untill I get the actual unit in.

Last night I completed a 3rd floor run in my alotted roughly 2 hours. I did learn a valuable lesson in connecting the take off to the plenum. Alwase know where your joint is and how much it overlaps. I hit a joint piece of the plenum this is not a bad thing however it is a nightmare to get the clips for the take off to fit properly to achieve the tight seal. I I would have moved my drill over 1.5 inches I would have missed the joint. Oh well I dont think I'll be doing any more AC projects anyway.

Tonight I started to get into finishing off the last two runs to the 1st floor. I quickly realized this would take longer than my 2 hrs so I went back up to the 3rd floor to look for something to do. I settled on placing the last piece of plenum. This took up my 2 hours easily between the taping and sheet metal screws etc. However the plenum is now complete and ready for me to make the last few runs off.