One was left.
Bathroom project moving along. I added some more holes in the house today and removed some plumbing while I was at it. I need to remove the old plumbing to make way for the new pipes that will bring water to and remove water from the second floor bathroom.
In getting the bid for the plumbing we had deiced that we wanted to use the space where the original water feeds were located. I was not sure how much wrecking I would end up doing today. I ended up doing enough for the removal of the added soil stack and all the hot and cold feed lines that went up to the second floor bathroom.
The initial copper tubing that was added during a remodel was the first pipe removed. This did not give much trouble only slight problems arose with one of the pipes not bending when needed. Next I removed the added soil stack leaving the PVC that went through the roof but removing the rest. I then set to work removing the original galvanized pipes that feed hot and cold water.
These were the chalenging pipes for the day. I was not sure how much destruction I would have to do to remove these but I ended up doing more than I thought. The small power room is basically in shambles but it does still work (I can and did use the toilet).
I am in a position now to start getting after that large cast-iron soil stack on Monday.